CASE STUDY AT-A-GLANCE

NETWORK REFRESH PROGRAM
WITH SPS

THE CHALLENGE

After the COVID-19 pandemic, a large Fortune 100 manufacturing company faced long supply chain delays that resulted in lifecycle refresh inventory and compliance issues with enterprise networking equipment. Once this inventory began to arrive, the backlog in on-site refresh projects required additional managed support teams, with prior experience in delivery these kinds of projects, to bring the effort back on schedule.​

THE REQUIREMENTS

https://solpartservices.com/wp-content/uploads/2025/05/Network-Refresh.png

Network Refresh

Refreshing network switches and wireless access points at all U.S.-based locations.
https://solpartservices.com/wp-content/uploads/2025/05/Completing-On-Time​.png

Completing On-Time

Bringing networks back to their 5-year refresh lifecycle.
https://solpartservices.com/wp-content/uploads/2025/05/End-to-End-Service​.jpeg

End-to-End Service

Managing the project from end-to-end with minimal effort required from their internal team.
https://solpartservices.com/wp-content/uploads/2025/05/Volume-Discount​.png

Volume Discount

Fixed volume pricing on locations supported.

THE SOLUTION

Refreshed all U.S.- based networks– Ensure their network was modernized, reliable, and capable of meeting their existing and future needs.
Delivered end-to-end managed service support– Provide management oversight and team needed to deliver the refresh.
Offered volume-discounted pricing– Tiered pricing based on volume of locations serviced during the project.

THE OUTCOME

Accelerated Network Refresh for Future 5-Year Parity (in years)

2.5

Cost Savings (per site)

10% → 20%

Establish Best Practice Processes

100%

THE FULL CASE STUDY

Click here to access the full case study.​